Eddon Boat Upland Park Project

Work in Progress:

· Placement of beach sand, driftwood and the log edge between within the limits of the beach area is complete.

· The contractor is preparing for placement of the granite artwork by pouring a concrete pad located in the southeast corner of the site.

Upcoming Work:

· The contractor is scheduled to do rough grading of the site and place topsoil within the next couple of weeks.

· Subsequent to placement of topsoil, the contractor will install the irrigation system.

Traffic and Construction Impacts:

· Although this is a public park it is currently also a construction site. All visitors must use caution when visiting the site, and only City or contractor personnel may enter the construction areas.

· There will be periodic disruptions to traffic at the intersection of Stinson Avenue and Harborview Drive for material deliveries and construction of the new sidewalk sections.

ACCESS TO ALL BUSINESSES and RESIDENCES WILL BE MAINTAINED AT ALL TIMES.

Primary project contact:
Marcos McGraw, Project Manager/Project Engineer
mcgrawm@cityofgigharbor.net
(253) 853-2647

Project Updates:
Project updates will be e-mailed

The City will circulate periodic updates by email. If you know someone that would be interested in receiving these email notices, please contact Melissa Jones, Engineering Assistant, at jonesm@cityofgigharbor.net.